A new system installed at a Police firing range: This Lead Dust and Propellant LEV system was installed over 3 days to replace the clients existing Lead Dust LEV system using the latest Low Energy Fan system.
Company fined £15,000 for wood dust failures.
In June 2022 the Health and Safety Executive (HSE) raised concerns about how a firm producing timber barns and stables, protected employees from wood dust